Commit graph

5 commits

Author SHA1 Message Date
Emi Griffith
df409f88b3 registry: move image and repo references to the Jinemi namespace
All checks were successful
PR build (required check) / changes (pull_request) Successful in 6s
secrets-guard / encrypted (pull_request) Successful in 4s
shell-lint / shellcheck (pull_request) Successful in 6s
PR build (required check) / validate-observability (pull_request) Successful in 20s
PR build (required check) / build-frontend (pull_request) Successful in 37s
PR build (required check) / build-backend (pull_request) Successful in 51s
PR build (required check) / gate (pull_request) Successful in 1s
Repos moved to the Jinemi org; the container packages did not follow, since
Forgejo does not transfer packages with a repo. The deploy path still resolved
`emi/thermograph/*` — a user_redirect to admin_emi — while build-push.yml
derives its push path from ${github.repository}, now jinemi/thermograph. The
next backend or frontend build would have published somewhere no deploy looks.

Point the image paths at jinemi/thermograph/* (lowercase: OCI references admit
no uppercase, which is why build-push.yml already pipes through tr), the clone
URLs at Jinemi/thermograph, and the registry logins at admin_emi — the account
that actually owns the tokens, rather than the redirect.

The live tags and both ci-runner tags were copied into the Jinemi namespace
first, so the switch has something to pull. thermograph-infra,
thermograph-observability and the retired */app packages stay under admin_emi;
they did not move.
2026-08-01 09:25:02 -07:00
emi
d138f00a20 infra: split the estate into vps1/vps2 — beta joins prod, dev gets a home (#103)
Some checks failed
Sync infra to hosts / sync-beta (push) Has been skipped
Sync infra to hosts / sync-prod (push) Has been skipped
Sync infra to hosts / sync-dev (push) Failing after 6s
secrets-guard / encrypted (push) Successful in 6s
shell-lint / shellcheck (push) Successful in 13s
Validate observability stack / validate (push) Successful in 17s
PR build (required check) / changes (pull_request) Successful in 6s
secrets-guard / encrypted (pull_request) Successful in 5s
PR build (required check) / build-backend (pull_request) Has been skipped
shell-lint / shellcheck (pull_request) Successful in 6s
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Successful in 18s
PR build (required check) / gate (pull_request) Successful in 2s
2026-07-26 06:56:38 +00:00
emi
d42a57a011 ci: collapse the eight deploy and build-push workflows into two (#87)
All checks were successful
secrets-guard / encrypted (push) Successful in 5s
shell-lint / shellcheck (push) Successful in 6s
PR build (required check) / changes (pull_request) Successful in 6s
PR build (required check) / build-backend (pull_request) Has been skipped
shell-lint / shellcheck (pull_request) Successful in 9s
PR build (required check) / gate (pull_request) Successful in 2s
secrets-guard / encrypted (pull_request) Successful in 6s
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Has been skipped
2026-07-25 07:48:49 +00:00
Emi Griffith
31b969039a docs: record the 2026-07-22 branch-migration sweep in cutover notes 2026-07-22 22:27:09 -07:00
Emi Griffith
210627f040 docs: monorepo README, cutover runbook, root agent instructions 2026-07-22 22:11:33 -07:00