Commit graph

3 commits

Author SHA1 Message Date
Emi Griffith
df409f88b3 registry: move image and repo references to the Jinemi namespace
All checks were successful
PR build (required check) / changes (pull_request) Successful in 6s
secrets-guard / encrypted (pull_request) Successful in 4s
shell-lint / shellcheck (pull_request) Successful in 6s
PR build (required check) / validate-observability (pull_request) Successful in 20s
PR build (required check) / build-frontend (pull_request) Successful in 37s
PR build (required check) / build-backend (pull_request) Successful in 51s
PR build (required check) / gate (pull_request) Successful in 1s
Repos moved to the Jinemi org; the container packages did not follow, since
Forgejo does not transfer packages with a repo. The deploy path still resolved
`emi/thermograph/*` — a user_redirect to admin_emi — while build-push.yml
derives its push path from ${github.repository}, now jinemi/thermograph. The
next backend or frontend build would have published somewhere no deploy looks.

Point the image paths at jinemi/thermograph/* (lowercase: OCI references admit
no uppercase, which is why build-push.yml already pipes through tr), the clone
URLs at Jinemi/thermograph, and the registry logins at admin_emi — the account
that actually owns the tokens, rather than the redirect.

The live tags and both ci-runner tags were copied into the Jinemi namespace
first, so the switch has something to pull. thermograph-infra,
thermograph-observability and the retired */app packages stay under admin_emi;
they did not move.
2026-08-01 09:25:02 -07:00
emi
5f20fba9f5 frontend: fix the three inconsistencies the onboarding guide found (#99)
All checks were successful
secrets-guard / encrypted (push) Successful in 5s
shell-lint / shellcheck (push) Successful in 8s
secrets-guard / encrypted (pull_request) Successful in 18s
PR build (required check) / changes (pull_request) Successful in 22s
shell-lint / shellcheck (pull_request) Successful in 19s
Build + push images (Forgejo registry) / build-push (backend) (push) Successful in 1m14s
PR build (required check) / build-backend (pull_request) Successful in 1m21s
PR build (required check) / gate (pull_request) Successful in 2s
Build + push images (Forgejo registry) / build-push (frontend) (push) Successful in 1m11s
PR build (required check) / validate-observability (pull_request) Has been skipped
PR build (required check) / build-frontend (pull_request) Successful in 1m1s
2026-07-25 21:11:32 +00:00
Emi Griffith
2b775abe6f Subtree-merge thermograph-frontend origin/dev into frontend/ (two-tier test suite; CI workflow ported to root)
# Conflicts:
#	frontend/.forgejo/workflows/build.yml
2026-07-22 22:23:50 -07:00