Commit graph

2 commits

Author SHA1 Message Date
Emi Griffith
e377c4de03 content: write the entities literally in pages.yaml titles and descriptions
pages.yaml's title/description are interpolated as plain strings into <title>
and <meta name="description">, so html/template escapes them. Writing an HTML
entity in the YAML therefore escapes it a second time and the user sees the
source. Live on main right now:

  <meta name="description" content="... a &amp;plusmn;7-day seasonal window ...">
  <title>Weather &amp;amp; climate glossary: ...</title>

which renders as a literal "&plusmn;7-day" in the SERP snippet and "&amp;" in
the browser tab, on the about and glossary pages. The Python->Go rewrite did not
change this: the entities live in the shared data file and both engines
autoescape identically.

glossary.yaml is deliberately NOT touched. Its `body` is typed template.HTML and
rendered raw (glossary_term.html.tmpl), so the entities and <b> tags there are
correct and would break if "fixed".

The regression test runs against the real content dir, which the frontend
Dockerfile already copies into the builder stage, so it gates the image rather
than only local runs.
2026-07-25 01:35:59 -07:00
emi
a4ecb51401 web/worker: add a process-level liveness heartbeat (#80)
Some checks failed
secrets-guard / encrypted (push) Successful in 24s
shell-lint / shellcheck (push) Successful in 26s
Deploy frontend to LAN dev server / build (push) Successful in 2m11s
Build + push frontend image (Forgejo registry) / build-push (push) Successful in 2m20s
Build + push backend image (Forgejo registry) / build-push (push) Successful in 2m28s
Deploy backend to LAN dev server / build (push) Successful in 2m45s
PR build (required check) / changes (pull_request) Successful in 16s
secrets-guard / encrypted (pull_request) Successful in 16s
shell-lint / shellcheck (pull_request) Successful in 15s
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Has been skipped
Deploy frontend to LAN dev server / deploy (push) Successful in 39s
PR build (required check) / build-backend (pull_request) Successful in 1m21s
PR build (required check) / gate (pull_request) Successful in 3s
Deploy backend to LAN dev server / deploy (push) Failing after 2m31s
2026-07-25 04:13:47 +00:00