Commit graph

8 commits

Author SHA1 Message Date
Emi Griffith
396b80cf91 forgejo: serve dev.jinemi.com alongside git.thermograph.org
Both hostnames go on a single Caddy site block. That is load-bearing rather
than cosmetic: the /v2/* mesh-only matcher that keeps the OCI registry API
off the public internet (hazard #15) is scoped per block, so a separate
block for the new name would serve the same Forgejo with the registry open.

git.thermograph.org stays canonical — Forgejo has one ROOT_URL and builds
every absolute URL from it, so clone URLs, the OAuth callback and post-login
redirects keep naming the .org host. Flipping FORGEJO_DOMAIN additionally
requires the Google OAuth redirect URI, the registry host baked into image
names and runner labels, and the mesh /etc/hosts pins; README documents
those prerequisites.

Config verified with `caddy validate` and by asserting against the adapted
JSON that the /v2 403 guard matches both hostnames.
2026-08-01 09:01:59 -07:00
Emi Griffith
001e6b1365 ci: add an always-on Actions runner on vps2
All checks were successful
secrets-guard / encrypted (pull_request) Successful in 5s
shell-lint / shellcheck (pull_request) Successful in 8s
PR build (required check) / changes (pull_request) Successful in 13s
PR build (required check) / build-backend (pull_request) Has been skipped
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Has been skipped
PR build (required check) / gate (pull_request) Successful in 2s
Sync infra to hosts / sync-beta (push) Has been skipped
Sync infra to hosts / sync-prod (push) Has been skipped
Sync infra to hosts / sync-dev (push) Successful in 7s
secrets-guard / encrypted (push) Successful in 7s
shell-lint / shellcheck (push) Successful in 7s
The estate had exactly one registered runner, on the desktop. It went offline
at 2026-07-31 16:31Z; for the next 21 hours no PR could satisfy a required
check, no deploy could run, and the 03:00Z ops-cron -- the only backup for both
application databases and for Forgejo -- did not fire. Forgejo queued that
scheduled run rather than dropping it, so it completed on reconnect and nothing
was lost. A longer outage would have meant real gaps.

Three files claimed an "always-on Swarm-hosted runner" existed and that the
estate therefore no longer depended on the desktop. It did not exist: an early
revision of docker-stack.yml ran one as a Docker-in-Docker sidecar and it was
removed. That claim is why a single point of failure sat unnoticed. Corrected
in docker-stack.yml, forgejo/README.md and register-lan-runner.sh.

The new runner is a plain restart:always container, not a Swarm service: a
Swarm-scheduled runner cannot redeploy the Swarm that schedules it, so CI would
be gone exactly when the cluster is what is broken. It runs from
/opt/forgejo-runner rather than in place, because the checkout is reset on
every prod deploy and one `git clean -fdx` there would destroy the
registration.

vps2 runs prod, so the socket mount is bounded rather than assumed benign:
capacity 1, --cpus=2/--memory=4g on job containers, valid_volumes empty so no
job can bind-mount /etc/thermograph.env, and no thermograph network joined.
This defends against accident, not against a hostile workflow author -- stated
plainly in the compose header rather than implied.

The desktop runner stays registered as extra capacity. Nothing may assume it
is up.
2026-08-01 07:54:28 -07:00
Emi Griffith
8a2c838663 forgejo: restart the db service on a clean exit, not just on failure
All checks were successful
shell-lint / shellcheck (pull_request) Successful in 6s
PR build (required check) / gate (pull_request) Successful in 1s
secrets-guard / encrypted (pull_request) Successful in 4s
PR build (required check) / changes (pull_request) Successful in 8s
PR build (required check) / build-backend (pull_request) Has been skipped
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Has been skipped
Sync infra to hosts / sync-beta (push) Has been skipped
Sync infra to hosts / sync-prod (push) Has been skipped
Sync infra to hosts / sync-dev (push) Successful in 5s
secrets-guard / encrypted (push) Successful in 4s
shell-lint / shellcheck (push) Successful in 6s
forgejo_db has been at 0/1 replicas since 2026-07-29 01:24 UTC. Postgres hit
an invalid data-directory lock file ("could not open file postmaster.pid ...
performing immediate shutdown because data directory lock file is invalid")
and exited 0. With restart_policy.condition=on-failure, Swarm read the zero
status as successful completion, marked the task Complete, and never
rescheduled it.

The forgejo service itself stayed Up and kept serving its homepage, so the
outage presented as every repository page, the whole API and all CI returning
500 with "dial tcp: lookup db on 127.0.0.11:53: no such host" — including the
auth path, which is why API calls reported "user does not exist [uid: 0]"
rather than a database error.

on-failure cannot distinguish "finished successfully" from "shut itself down
and should be restarted", and Postgres exits 0 on several such paths, so it is
the wrong policy for an always-on stateful service.

This is the durable fix; it does not restart the currently stopped task.
2026-07-30 06:30:30 -07:00
emi
d138f00a20 infra: split the estate into vps1/vps2 — beta joins prod, dev gets a home (#103)
Some checks failed
Sync infra to hosts / sync-beta (push) Has been skipped
Sync infra to hosts / sync-prod (push) Has been skipped
Sync infra to hosts / sync-dev (push) Failing after 6s
secrets-guard / encrypted (push) Successful in 6s
shell-lint / shellcheck (push) Successful in 13s
Validate observability stack / validate (push) Successful in 17s
PR build (required check) / changes (pull_request) Successful in 6s
secrets-guard / encrypted (pull_request) Successful in 5s
PR build (required check) / build-backend (pull_request) Has been skipped
shell-lint / shellcheck (pull_request) Successful in 6s
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Successful in 18s
PR build (required check) / gate (pull_request) Successful in 2s
2026-07-26 06:56:38 +00:00
emi
d42a57a011 ci: collapse the eight deploy and build-push workflows into two (#87)
All checks were successful
secrets-guard / encrypted (push) Successful in 5s
shell-lint / shellcheck (push) Successful in 6s
PR build (required check) / changes (pull_request) Successful in 6s
secrets-guard / encrypted (pull_request) Successful in 6s
PR build (required check) / build-backend (pull_request) Has been skipped
PR build (required check) / build-frontend (pull_request) Has been skipped
shell-lint / shellcheck (pull_request) Successful in 9s
PR build (required check) / validate-observability (pull_request) Has been skipped
PR build (required check) / gate (pull_request) Successful in 2s
2026-07-25 07:48:49 +00:00
emi
2c7ceefab4 infra/forgejo: give the LAN runner's PATH ~/.local/bin (#84)
All checks were successful
secrets-guard / encrypted (push) Successful in 5s
shell-lint / shellcheck (push) Successful in 6s
2026-07-25 06:59:21 +00:00
emi
a4ecb51401 web/worker: add a process-level liveness heartbeat (#80)
Some checks failed
secrets-guard / encrypted (push) Successful in 24s
shell-lint / shellcheck (push) Successful in 26s
Deploy frontend to LAN dev server / build (push) Successful in 2m11s
Build + push frontend image (Forgejo registry) / build-push (push) Successful in 2m20s
Build + push backend image (Forgejo registry) / build-push (push) Successful in 2m28s
Deploy backend to LAN dev server / build (push) Successful in 2m45s
PR build (required check) / changes (pull_request) Successful in 16s
secrets-guard / encrypted (pull_request) Successful in 16s
shell-lint / shellcheck (pull_request) Successful in 15s
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Has been skipped
Deploy frontend to LAN dev server / deploy (push) Successful in 39s
PR build (required check) / build-backend (pull_request) Successful in 1m21s
PR build (required check) / gate (pull_request) Successful in 3s
Deploy backend to LAN dev server / deploy (push) Failing after 2m31s
2026-07-25 04:13:47 +00:00
Emi Griffith
ae1d9bb534 Subtree-merge thermograph-infra (origin/main) into infra/
git-subtree-dir: infra
git-subtree-mainline: d6df04eab2
git-subtree-split: 99b4b3f78d
2026-07-22 22:01:11 -07:00