Commit graph

2 commits

Author SHA1 Message Date
Emi Griffith
94595dcad1 Finish the domain-sha tag keying: three deploy workflows were missed
All checks were successful
PR build (required check) / changes (pull_request) Successful in 6s
secrets-guard / encrypted (pull_request) Successful in 5s
PR build (required check) / build-backend (pull_request) Has been skipped
PR build (required check) / build-frontend (pull_request) Has been skipped
PR build (required check) / validate-observability (pull_request) Has been skipped
PR build (required check) / gate (pull_request) Successful in 2s
The previous pass's patch loop aborted on an assertion partway through,
leaving frontend-deploy, backend-deploy-prod, and frontend-deploy-prod
still keying on GITHUB_SHA -- which is why their re-proof dispatches went
looking for images tagged with promotion-merge tips. Same fix as the
rest: full-depth checkout + git log -1 -- <domain>/.
2026-07-23 06:58:11 -07:00
Emi Griffith
7b2db07722 CI: port the split repos' workflows to per-domain path-filtered monorepo pipelines
One root workflow set replaces the four repos' copies (deleted -- root-only
is where Forgejo reads them, and dead copies are a trap): per-domain
build-push with explicit image paths (emi/thermograph/backend|frontend; the
old github.repository-derived path collides in a monorepo), path-filtered
per-domain beta/prod/dev deploys, a domain-input reusable build check, a
single always-reporting PR gate (path-filtered required checks deadlock
auto-merge), a new infra-sync pipeline (host checkout + secrets render on
infra/** pushes), and ports of secrets-guard / ops-cron /
observability-validate to monorepo paths.
2026-07-22 22:11:33 -07:00