Thermograph monorepo: graded-climate API + SSR frontend + infra, domain-specific containerized deploys
Find a file
emi a787f79f92
All checks were successful
Build + push backend image (Forgejo registry) / build-push (push) Successful in 1m34s
secrets-guard / encrypted (push) Successful in 7s
Deploy backend to LAN dev server / build (push) Successful in 1m37s
Deploy backend to LAN dev server / deploy (push) Successful in 18s
Survive Contabo PUT throttling in the lake extractor (#22)
2026-07-23 22:47:26 +00:00
.forgejo/workflows Run the ERA5 lake service in every environment (#20) 2026-07-23 22:32:13 +00:00
backend Survive Contabo PUT throttling in the lake extractor (#22) 2026-07-23 22:47:26 +00:00
frontend Subtree-merge thermograph-frontend origin/dev into frontend/ (two-tier test suite; CI workflow ported to root) 2026-07-22 22:23:50 -07:00
infra Run the ERA5 lake service in every environment (#20) 2026-07-23 22:32:13 +00:00
observability CI: port the split repos' workflows to per-domain path-filtered monorepo pipelines 2026-07-22 22:11:33 -07:00
CLAUDE.md docs: monorepo README, cutover runbook, root agent instructions 2026-07-22 22:11:33 -07:00
CUTOVER-NOTES.md docs: record the 2026-07-22 branch-migration sweep in cutover notes 2026-07-22 22:27:09 -07:00
README.md docs: monorepo README, cutover runbook, root agent instructions 2026-07-22 22:11:33 -07:00

thermograph

The Thermograph monorepo — the split repos reunified (2026-07-22) with full history via subtree merges, while keeping everything the split was actually for: per-domain images, per-domain deploys, and an async FE/BE contract.

Domains

Dir What CI
backend/ FastAPI graded-climate API, accounts, notifications (Discord bot, push, mail), data pipeline backend-build-push → image emi/thermograph/backend; backend-deploy[-prod|-dev]
frontend/ Public client: static JS/CSS + SSR pages frontend-* mirrors of the above; image emi/thermograph/frontend
infra/ Compose, deploy scripts, terraform, SOPS secrets vault, ops cron infra-sync (host checkout + secrets render), secrets-guard, ops-cron
observability/ Loki + Grafana + Alloy stack observability-validate

thermograph-docs deliberately stays its own repo (ADRs + runbooks, no build artifacts, different change cadence).

How CI stays decoupled

Every workflow in .forgejo/workflows/ is path-filtered to its domain: a push touching only frontend/** builds/deploys nothing else. Images stay separate (emi/thermograph/backend, emi/thermograph/frontend, each tagged sha-<12hex>), deploys stay per-service (infra/deploy/deploy.sh SERVICE=backend|frontend|all), and the API version contract (GET /api/version, PAYLOAD_VER) still lets FE and BE ship out of lockstep. The one intentionally coupled piece is pr-build.yml: a single always-running gate required check that builds only the domains a PR touches (a path-filtered required check would deadlock auto-merge).

Branch model (unchanged from the split era): PRs → dev, main → beta, release → prod; infra tracked via main on all hosts.

Before pointing anything live at this repo, read CUTOVER-NOTES.md.